5-4 Magellan
TM
8500Xt Scanner
Preparing the Scanner/Scale for Calibration
1. Assure that the scanner/scale is stable, secure and properly
installed. (Refer to
Section 2, Site Preparation and Installation for
instructions on the proper installation
of the scanner/scale).
2. Power-up the scanner/scale.
3. Allow the unit to reach temperature equilibrium for at least one
hour
. If the scanner/scale is already at room temperature, allow at
least 15 minutes for acclimatization.
4. Before performing the calibration, the scan
ner/scale must be pre-
stressed with a weight of more than
30 pounds (15kg). With
power turned on, place the entire weight set (including the case)
on the weighing surface of the scale. The display should show an
underscore and three hyphens
, which is the over-
weight indication.
5. Remove all weight from the weighing surface and ensure that
the
re are no obstructions in the debris chutes of the scanner/scale.
See
Figure 2-3.